top of page
Search

Essentials of Technical Operations for Oil Casing Workers

  • Writer: ma ss
    ma ss
  • Jan 17, 2022
  • 1 min read

Points for workers’ technical operations: 1. Parameter setting: Set the test pressure value and voltage stabilization time according to the specifications of the petroleum pipe to be tested, the steel grade (in short, the material of the petroleum casing pipe), and the thread type (button type). 2. Perform a full-length hydrostatic test on each petroleum pipe. The actual test pressure and minimum voltage stabilization time must meet the requirements of the process card (sometimes, the voltage stabilization time is appropriately adjusted according to the quality of the raw materials); 3. During the pressure test, always check whether the seals are intact, whether there is leakage, and there are no traces of water leakage; 4. Oil pipe test , pressure control range: ≥ standard hydraulic test pressure; 5. Fill in the hydrostatic test records carefully.

 
 
 

Recent Posts

See All
Galvanized Features

The appearance of a bluish-white zinc coating, the standard electrode potential is -0.76V, soluble in acid, alkali-soluble, metal music...

 
 
 

Comments


Post: Blog2_Post

+8618632758880

  • Facebook
  • Twitter
  • LinkedIn

©2022 by cangzhou wilson pipeline co.,ltd. Proudly created with Wix.com

bottom of page