Package of steel tube requirements substantially pided into two categories: one is the common type of bale, and the other is with totes similar container load.
Bundled package Avoid pipe damage by baling and transportation process, baling signs to a uniform and consistent.
The same bundle of steel pipe should be the same furnace number (Lot), with the steel grade, the same specifications of the steel pipe, should not be mixed furnace (batch) bundling, it should be less than a bundle into small bundles.
Weight of each pipe bundle should not exceed 50kg. The user’s consent to increase the bale weight, but the most important can not exceed 80kg.
Pipe bundle respect to the blunt end, should be aligned at one end, the tube ends are aligned side by less than 20mm, each bundle of steel pipe length difference less than 10mm, but according to the length of the pipe is usually the order of each bundle pipe length difference is less than 5mm, the longest pipe bundle and Minister of not more than 10mm.
Containers package Cold-rolled or cold-drawn seamless steel tubes, the surface finish of hot-rolled stainless steel tube, the container may be used (such as plastic containers and wooden box) packaging.
Weight of the container shall be packed in accordance with Table 1. Negotiated by both sides, the maximum weight of each container can be increased.
When the pipe into the container, the inner wall of the container should be fitted cardboard, plastic sheeting or other moisture-proof material. Containers should not be closely seepage.
For steel containers and packaging, a label should be included in the container. The outer end surface of the container should also be linked to a label.
Steel with special packaging requirements, by agreement between.
Comments